Delivering Critical Infrastructure Across Malaysia
For over two decades, ANPEC has supported the development, maintenance, and enhancement of power infrastructure through technical expertise, safety-focused execution, and a commitment to engineering excellence.
Project Portfolios
| Contract No. | Project | Category | Client | Value |
|---|---|---|---|---|
| TNB 239/2024 | PMU 132/33kV Amanjaya ITC & Extension (2×90 MVA), Kedah | HV Infrastructure | Tenaga Nasional Berhad | RM 21.20M |
| TNB 741/2024 | Supply, Install and Commissioning of Transformer Explosion Fire Prevention System (TEFPS) for Mainhead A1: PMU KL City Centre (KLCC), PMU TNB-HQ (TNHQ) & PMU Sentul Raya (SRYA) | Transformer Services | Tenaga Nasional Berhad | RM 23.10M |
| T.9311 | Mid-Life Power Transformer Refurbishment Work at PMU Kalumpang, PMU Menggaris, PMU Kudat, PMU Tenom Town, PMU Northern Town, and PMU Papar | Transformer Services | Sabah Electricity Sdn. Bhd. | RM 10.20M |
| TNB 1044/2025 | PMU 132/33kV Lipat Kajang Extension (2 x 90MVA), Melaka | HV Infrastructure | Tenaga Nasional Berhad | RM 29.00M |
| TNB 1216/2025 | PMU 132/33kV Kandis Extension (T3, 1 x 45MVA), Kelantan | HV Infrastructure | Tenaga Nasional Berhad | RM 15.50M |
Track Record
Completed Projects
HV / LV Infrastructure
Transformer Services
HV / LV Infrastructure
TNB 1310/2023Replacement of 25MVA 132kV Reactor at PMU Sungai Pinang, Pulau PinangTenaga Nasional Berhad
TNB 2085/2021Asset Replacement and Refurbishment for Primary and Combined Equipment – Mainhead B: PMU 275/33kV Temenggor (Reactor Replacement)Tenaga Nasional Berhad
TNB 2084/2021Asset Replacement and Refurbishment for Primary and Combined Equipment – Mainhead A: PMU 132kV Teluk Ewa (Reactor Replacement)Tenaga Nasional Berhad
UMP/PPH.T/2023(8)Kerja-Kerja Penggantian Panel Switchgear 11kV Di Pencawang Elektrik No 1 (Main Intake) Universiti Malaysia Pahang, PekanUniversiti Malaysia Pahang
TNB 2248/2019Kerja-Kerja Membaiki Tamatan Kabel Pada 33/22/11kV Alatubah dan Alatsuis Untuk Tempoh 2 Tahun Bagi Grid Maintenance Zon Tengah, Zon Timur, Zon Utara, Zon Selatan.Tenaga Nasional Berhad
Transformer Services
TNB 2562/2023Supply, Install & Commissioning of Online Monitoring System for Transformer (OMS-TX), Grid Maintenance Department, Grid Division Mainhead IV: PMU Bahau South, PMU Alor Gajah, PMU Yong Peng East.Tenaga Nasional Berhad
TNB 2561/2023Supply, Install & Commissioning of Online Monitoring System for Transformer (OMS-TX), Grid Maintenance Department, Grid Division Mainhead III: PMU Shah Alam Seksyen 18 GIS, PMU Puchong Perdana, PMU Port Klang, PMU Bukit Raja GIS.Tenaga Nasional Berhad
TNB 3543/2019Mainhead B: Supply, Installation & Commissioning of Multi Gas Monitoring System at PMU Ayer Tawar, PMU National University & PMU Bukit Batu for Grid Maintenance Department, Grid Division, TNBTenaga Nasional Berhad
TNB 3542/2019Mainhead A: Supply, Installation & Commissioning of Bushing Monitoring System at PMU Ayer Tawar & PMU Bukit Batu for Grid Maintenance Department, Grid Division, TNB.Tenaga Nasional Berhad
MTM/P&SC/084-2022Appointment of Contractor to Perform Midlife Service Work with Anpec Global Corporation Sdn. Bhd.Malaysia Transformer Manufacturing Sdn. Bhd.
MTMM-VDR-23-0038Appointment of Contractor to Perform Midlife Rejuvenation Service Works with Anpec Global Corporation Sdn. Bhd.Malaysia Transformer Manufacturing Sdn. Bhd.
T.8911Mid-Life Power Transformer Major Refurbishment Work at PMU Rancaranca, Labuan – Stage 2Sabah Electricity Sdn. Bhd.